Project Okjeong~Pocheon metropolitan railway system field basic and detailed design service
Summary .
Period 2023-12-19 ~ 2025-12-24
Test Item
Expenses 8,101,950,000¿ø
Ordering Gyeonggi Provincial Government Northern Office
Design for Tunnel Emergency Facilities of Sunsan a¡¦
Design for Tunnel Emergency Facilities of Kwangmyu¡¦
Design for the Electric System at 6 places includi¡¦
Detail Design for the Electric System of Colombo-K¡¦
Detail Design for the Electric System at Chilwon T¡¦
Design for the Electric System in the West Coast H¡¦
Design for the Electric System from Jeonju to Hamy¡¦
Detail Design for Electric System of South Coast H¡¦
Detail Design for Electric System of Seoul Outer R¡¦
Detail Design for Tunnel Electricity from Pyukjai ¡¦
Design for the Electric System from Sihung to Ansa¡¦
Design for the Electric System from Jinju to Seoji¡¦
Design for the Electric System for Yongpyung Tunne¡¦
Basic Design for the Electric System from Wonju to¡¦
Basic and Detail Design for High Efficiency Power ¡¦
Electricity and Communication Design for Container¡¦
Design for Constant Temperature Improvement Facili¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] [7] [8] 9 [10]  ¢º [³¡]