Project Okjeong~Pocheon metropolitan railway system field basic and detailed design service
Summary .
Period 2023-12-19 ~ 2025-12-24
Test Item
Expenses 8,101,950,000¿ø
Ordering Gyeonggi Provincial Government Northern Office
Design for the Electric System from Ulsan to Pohan¡¦
Design of the Electric System for Busan Outer Ring¡¦
Design for the Electric System at Kwanack road of ¡¦
Design for the Electric System from Janghung to Kw¡¦
Design for the Electric System from Pangyo to Gihu¡¦
Design for the Electric System from Jeonju to Nawo¡¦
Design for the Electric System from Dangyang to Su¡¦
Design for the Electric System from Chuncheon to D¡¦
Design for the Electric System from Hampyung to Kw¡¦
Design for the Electric System from Bosung to Sunc¡¦
Design for Electric System from Iksan to Jangsu, L¡¦
Design Review for the Tunnel Lighting from Wonpyun¡¦
Design for the Electric System of Donghae Highway
Detail Design for Relocation of Substation between¡¦
Detail Design for Lighting Pole between Ilsan and ¡¦
Detail Design for the Electric System of Ihwa Tunn¡¦
Design for the Electric System of New Yeoju Gas St¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] [7] 8 [9] [10]  ¢º [³¡]