Project Okjeong~Pocheon metropolitan railway system field basic and detailed design service
Summary .
Period 2023-12-19 ~ 2025-12-24
Test Item
Expenses 8,101,950,000¿ø
Ordering Gyeonggi Provincial Government Northern Office
Detail Design for Hadong T/P S.W extension of 345k¡¦
Design for Replacement of 362kV GIS at SinNamwon S¡¦
Design for the 154kV Substation in the Concentrate¡¦
Design for Indoor Type 154kV GIS at Wangsipli S/S
Design Supervision for Installation Work of 154kv ¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for 22.9kV Incoming Spare Power
Detail Design for the Electric System at Celltrion¡¦
Detail Design for Automation of Busan Petroleum Re¡¦
Design for Control System of SinSuwon 345kV Power ¡¦
Design for 154kV Steel Tower Undergrounding Work a¡¦
Design for the Electric System at Incoming and Out¡¦
Design for Control System of 345kV S.W Extension a¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for Undergrounding Work of Interfering 154k¡¦
Design for the Cable Tunnel at University of Educa¡¦
Design for the Electric System from Ulsan to Pohan¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] 7 [8] [9] [10]  ¢º [³¡]