Project Design for the 154kV Substation in the Concentrated Load Area
Summary CIS:170kV 20 cct, 25.8kV 92cct, MTR:154kV 45/60 MVA 8 Bank
Period 2005.10 ~ 2006.09
Test Item
Expenses 236,574,000¿ø
Ordering Korea Electric Power Corporation
Detail Design for Hadong T/P S.W extension of 345k¡¦
Design for Replacement of 362kV GIS at SinNamwon S¡¦
Design for the 154kV Substation in the Concentrate¡¦
Design for Indoor Type 154kV GIS at Wangsipli S/S
Design Supervision for Installation Work of 154kv ¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for 22.9kV Incoming Spare Power
Detail Design for the Electric System at Celltrion¡¦
Detail Design for Automation of Busan Petroleum Re¡¦
Design for Control System of SinSuwon 345kV Power ¡¦
Design for 154kV Steel Tower Undergrounding Work a¡¦
Design for the Electric System at Incoming and Out¡¦
Design for Control System of 345kV S.W Extension a¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for Undergrounding Work of Interfering 154k¡¦
Design for the Cable Tunnel at University of Educa¡¦
Design for the Electric System from Ulsan to Pohan¡¦