Project Okjeong~Pocheon metropolitan railway system field basic and detailed design service
Summary .
Period 2023-12-19 ~ 2025-12-24
Test Item
Expenses 8,101,950,000¿ø
Ordering Gyeonggi Provincial Government Northern Office
Okjeong~Pocheon metropolitan railway system field ¡¦
Detailed design service for the improvement of pow¡¦
Detailed design service for replacement of 22.9kV ¡¦
Detailed Design Service for Electric Power Facilit¡¦
New Ansan Line (tentative name) Jangha Station Con¡¦
Daejeon Urban Railway Line 2 Basic and Detailed De¡¦
Detailed design supervision service for electricit¡¦
Basic Design for Byeolnae Line (Amsa-Byeolnae) Dou¡¦
Basic and detailed design for construction work fr¡¦
Basic and detailed design for catenary and power s¡¦
Basic and detailed design for the electrical syste¡¦
Detailed design service for power substation facil¡¦
Detail Design for Substation Equipment Replacement¡¦
Countermeasure Study for Traffic Improvement of No¡¦
Design for Rectifier Replacement of Dusil Substati¡¦
Basic and Detail Design for Rolling Stock Operatio¡¦
Basic Design Supplementation and Service for Biddi¡¦

[óÀ½] ¢¸  1 [2] [3]  ¢º [³¡]