Project Incheon New Port Phase 1-2 Construction Project Management (including Design VE)
Summary .
Period 2023.03.29 ~ 2024.08.24
Test Item
Expenses 189,970,000¿ø
Ordering Incheon Port Authority
Incheon New Port Phase 1-2 Construction Project Ma¡¦
Sejong-Anseong (Section 4~7) Expressway Electrical¡¦
Sejong-Anseong (Sections 1-3) Expressway Electrica¡¦
Basic and detailed design service for tourist tran¡¦
Basic and detailed design service for onshore powe¡¦
Anseong-Guri (Section 7~9) Expressway Electrical D¡¦
Basic and detailed design service for onshore powe¡¦
Busan Port New Port West Container Terminal Upper ¡¦
Design of the Electric System for three Highways i¡¦
Detailed design of Electricity Power facility for ¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Busan Outer Ring¡¦
Design for the Electric System from Ulsan to Pohan¡¦
Design for the Electric System from Ulsan to Pohan¡¦
Design of the Electric System for Busan Outer Ring¡¦
Design for the Electric System at Kwanack road of ¡¦

[óÀ½] ¢¸  1 [2] [3] [4] [5]  ¢º [³¡]