Project Busan Port New Port West Container Terminal Upper Functional Facility Electrical Work Basic and Detailed Design Service
Summary .
Period 2019-05-20 ~ 2020-11-21
Test Item
Expenses 1,811,276,000원
Ordering Busan Port Authority
Incheon New Port Phase 1-2 Construction Project Ma…
Sejong-Anseong (Section 4~7) Expressway Electrical…
Sejong-Anseong (Sections 1-3) Expressway Electrica…
Basic and detailed design service for tourist tran…
Basic and detailed design service for onshore powe…
Anseong-Guri (Section 7~9) Expressway Electrical D…
Basic and detailed design service for onshore powe…
Busan Port New Port West Container Terminal Upper …
Design of the Electric System for three Highways i…
Detailed design of Electricity Power facility for …
Design of the Electric System for Ulsan – Po…
Design of the Electric System for Ulsan – Po…
Design of the Electric System for Busan Outer Ring…
Design for the Electric System from Ulsan to Pohan…
Design for the Electric System from Ulsan to Pohan…
Design of the Electric System for Busan Outer Ring…
Design for the Electric System at Kwanack road of …

[처음] ◀  1 [2] [3] [4] [5]  ▶ [끝]