Project Incheon New Port Phase 1-2 Construction Project Management (including Design VE)
Summary .
Period 2023.03.29 ~ 2024.08.24
Test Item
Expenses 189,970,000¿ø
Ordering Incheon Port Authority
Detail Design for the Electric System of Colombo-K¡¦
Detail Design for the Electric System at Chilwon T¡¦
Design for the Electric System in the West Coast H¡¦
Design for the Electric System from Jeonju to Hamy¡¦
Detail Design for Electric System of South Coast H¡¦
Detail Design for Electric System of Seoul Outer R¡¦
Detail Design for Tunnel Electricity from Pyukjai ¡¦
Design for the Electric System from Sihung to Ansa¡¦
Design for the Electric System from Jinju to Seoji¡¦
Design for the Electric System for Yongpyung Tunne¡¦
Basic Design for the Electric System from Wonju to¡¦
Basic and Detail Design for High Efficiency Power ¡¦
Electricity and Communication Design for Container¡¦
Design for Constant Temperature Improvement Facili¡¦
Basic and Detail Design for Electricity in Pyungta¡¦
Detail Design for Extra High Tension Line Replacem¡¦
Detail Design for Electricity and Communication Sy¡¦

[óÀ½] ¢¸  [1] [2] 3 [4] [5]  ¢º [³¡]