Project Incheon New Port Phase 1-2 Construction Project Management (including Design VE)
Summary .
Period 2023.03.29 ~ 2024.08.24
Test Item
Expenses 189,970,000¿ø
Ordering Incheon Port Authority
Design for the Electric System from Janghung to Kw¡¦
Design for the Electric System from Pangyo to Gihu¡¦
Design for the Electric System from Jeonju to Nawo¡¦
Design for the Electric System from Dangyang to Su¡¦
Design for the Electric System from Chuncheon to D¡¦
Design for the Electric System from Hampyung to Kw¡¦
Design for the Electric System from Bosung to Sunc¡¦
Design for Electric System from Iksan to Jangsu, L¡¦
Design Review for the Tunnel Lighting from Wonpyun¡¦
Design for the Electric System of Donghae Highway
Detail Design for Relocation of Substation between¡¦
Detail Design for Lighting Pole between Ilsan and ¡¦
Detail Design for the Electric System of Ihwa Tunn¡¦
Design for the Electric System of New Yeoju Gas St¡¦
Design for Tunnel Emergency Facilities of Sunsan a¡¦
Design for Tunnel Emergency Facilities of Kwangmyu¡¦
Design for the Electric System at 6 places includi¡¦

[óÀ½] ¢¸  [1] 2 [3] [4] [5]  ¢º [³¡]