Project Okjeong~Pocheon metropolitan railway system field basic and detailed design service
Summary .
Period 2023-12-19 ~ 2025-12-24
Test Item
Expenses 8,101,950,000¿ø
Ordering Gyeonggi Provincial Government Northern Office
Basic and detailed design for the electrical syste¡¦
Basic and detailed design for Railroad Constructio¡¦
Detailed design for transmission line and traction¡¦
Detailed design for electromotive facilities impro¡¦
Detailed design for the electrification on double ¡¦
Basic design for power supply facilities in the el¡¦
Detailed design service for power substation facil¡¦
Detailed design of 154kV Transmission Line and Tra¡¦
Detailed design of Head-spen Line Improvement from¡¦
Design of the Electric System for three Highways i¡¦
Detailed design for Relocation of interfering Cate¡¦
Basic design of Catenary system for 400km/h speed
Detailed design of Electricity Power facility for ¡¦
Design of 345kV Traction Power Supply System for N¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Busan Outer Ring¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] 5 [6] [7] [8] [9] [10]  ¢º [³¡]