Project Detailed design for Relocation of interfering Catenary System from Uiwang to Seongdae on Gyeongbu Line
Summary Uiwang to Seongdae
Period 2011.08 ~ 2011.09
Test Item
Expenses 8,063,800¿ø
Ordering Korea Railroad
Basic and detailed design for the electrical syste¡¦
Basic and detailed design for Railroad Constructio¡¦
Detailed design for transmission line and traction¡¦
Detailed design for electromotive facilities impro¡¦
Detailed design for the electrification on double ¡¦
Basic design for power supply facilities in the el¡¦
Detailed design service for power substation facil¡¦
Detailed design of 154kV Transmission Line and Tra¡¦
Detailed design of Head-spen Line Improvement from¡¦
Design of the Electric System for three Highways i¡¦
Detailed design for Relocation of interfering Cate¡¦
Basic design of Catenary system for 400km/h speed
Detailed design of Electricity Power facility for ¡¦
Design of 345kV Traction Power Supply System for N¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Ulsan – Po¡¦
Design of the Electric System for Busan Outer Ring¡¦