Project Design for Constant Temperature Improvement Facilities in Gamcjun Port
Summary 0
Period 2010.11 ~ 2010.12
Test Item
Expenses 16,000,000¿ø
Ordering Korea Port Engineering Corporation
Design for Tunnel Emergency Facilities of Sunsan a¡¦
Design for Tunnel Emergency Facilities of Kwangmyu¡¦
Design for the Electric System at 6 places includi¡¦
Detail Design for the Electric System of Colombo-K¡¦
Detail Design for the Electric System at Chilwon T¡¦
Design for the Electric System in the West Coast H¡¦
Design for the Electric System from Jeonju to Hamy¡¦
Detail Design for Electric System of South Coast H¡¦
Detail Design for Electric System of Seoul Outer R¡¦
Detail Design for Tunnel Electricity from Pyukjai ¡¦
Design for the Electric System from Sihung to Ansa¡¦
Design for the Electric System from Jinju to Seoji¡¦
Design for the Electric System for Yongpyung Tunne¡¦
Basic Design for the Electric System from Wonju to¡¦
Basic and Detail Design for High Efficiency Power ¡¦
Electricity and Communication Design for Container¡¦
Design for Constant Temperature Improvement Facili¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] [7] [8] 9 [10]  ¢º [³¡]