Project Detail Design for the Power Supply System on Jeonla Line, Stage No.1 and Stage No.2
Summary 0
Period 1997.04 ~ 1998.11
Test Item
Expenses 94,230,000¿ø
Ordering KORAIL
Detail Design for the Electrifical Facilities from¡¦
Detail Design for the Catenary System of the Rolli¡¦
Detail Design for the Power Supply System at 3 pla¡¦
Service for Standard Method of Actual Cost Calcula¡¦
Basic Design for Electrification of the Rolling St¡¦
Detail Design for Electrification from Backyangli ¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary System Improvement from¡¦
Detail Design for Bidding Documents of the Double ¡¦
Detail Design for Relocation of the Power Supply S¡¦
Standardization and CAD Work for the Catenary Syst¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary and Power Supply System¡¦
Design for Turn Key Base Proposal of Seoul Rolling¡¦
Detail Design for High Voltage Distribution Line I¡¦
Detail Design for the Power Supply System on Jeonl¡¦
Detail Design for Relocation of the Catenary Syste¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] [7] 8 [9]  ¢º [³¡]