Project Detail Design for the Power Supply System at 3 places including Middle Point Sectioning Post of Busan Rolling Stock Depot Substation on Gyeongbu High Speed Railway
Summary 0
Period 1999.10 ~ 2001.04
Test Item
Expenses 434,245,000¿ø
Ordering Korea Train Express
Detail Design for the Electrifical Facilities from¡¦
Detail Design for the Catenary System of the Rolli¡¦
Detail Design for the Power Supply System at 3 pla¡¦
Service for Standard Method of Actual Cost Calcula¡¦
Basic Design for Electrification of the Rolling St¡¦
Detail Design for Electrification from Backyangli ¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary System Improvement from¡¦
Detail Design for Bidding Documents of the Double ¡¦
Detail Design for Relocation of the Power Supply S¡¦
Standardization and CAD Work for the Catenary Syst¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary and Power Supply System¡¦
Design for Turn Key Base Proposal of Seoul Rolling¡¦
Detail Design for High Voltage Distribution Line I¡¦
Detail Design for the Power Supply System on Jeonl¡¦
Detail Design for Relocation of the Catenary Syste¡¦