Project Daegu Industrial Line Railway Construction Subway Power Equipment Basic and Detailed Design
Summary .
Period 2023-11-23 ~ 2026-08-26
Test Item
Expenses 2,006,856,000¿ø
Ordering KOREA NATIONAL RAILWAY
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for the Catenary and Power Supply Sy¡¦
Detail Design for the Power Supply System at Goyan¡¦
Detail Design Supervision for the Catenary and the¡¦
Detail Design Supervision for the Catenary System ¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for New Installation of Chungyang Sp¡¦
Detail Design for the Flame Resistance Work at 3 p¡¦
Detail Design for Catenary System Improvement at 2¡¦
Detail Design for the Electrical Remote Control Fa¡¦
Detail Design for the Equipotential Ground Facilit¡¦
Detail Design for the Catenary System from Juklyun¡¦
Detail Design for the Catenary System from Daegu t¡¦
Detail Design for the Traction Power Supply System¡¦
Detail Design for Power Supply System Replacement ¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] 6 [7] [8] [9]  ¢º [³¡]