Company
CEO greeting
History
Organization
CI&Mascot
QMS
Registration&Prize
Map
Main Business
Design
Supervision
Construction
Diagnosis Service
R&D Service
Overseas Businesses
R&D Center
Purpose&Vision of Research
Technical Cooperation
Patent/utility model
Patent
Untility model
Customer Center
Gallery
Brochure
Q&A
Project
Standardization and CAD Work for the Catenary System
Summary
0
Period
1998.12 ~ 1998.12
Test Item
Expenses
22,300,000¿ø
Ordering
KORAIL
Detail Design for the Electrifical Facilities from¡¦
Detail Design for the Catenary System of the Rolli¡¦
Detail Design for the Power Supply System at 3 pla¡¦
Service for Standard Method of Actual Cost Calcula¡¦
Basic Design for Electrification of the Rolling St¡¦
Detail Design for Electrification from Backyangli ¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary System Improvement from¡¦
Detail Design for Bidding Documents of the Double ¡¦
Detail Design for Relocation of the Power Supply S¡¦
Standardization and CAD Work for the Catenary Syst¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary and Power Supply System¡¦
Design for Turn Key Base Proposal of Seoul Rolling¡¦
Detail Design for High Voltage Distribution Line I¡¦
Detail Design for the Power Supply System on Jeonl¡¦
Detail Design for Relocation of the Catenary Syste¡¦
[óÀ½]
¢¸
[1]
[2]
[3]
[4]
[5]
[6]
[7]
8
[9]
¢º
[³¡]