Project Detailed design service for improvement of substation facilities and substation building in 3 places other than Goyang Electric Railway substation
Summary .
Period 2021-01-27 ~ 2022-07-26
Test Item
Expenses 1,529,754,000¿ø
Ordering Korea National Railway
Detailed design service for replacement of 22.9kV ¡¦
Basic Design for Dongtan Urban Railway (Tram) Elec¡¦
Railway construction standards advancement service¡¦
Detailed Design Service for Electric Power Facilit¡¦
Detailed Design Service for Electric Power Equipme¡¦
Detailed Design Service for Electrical Constructio¡¦
Sejong-Anseong (Section 4~7) Expressway Electrical¡¦
Detailed design service for LTE-R power supply pow¡¦
Detailed design service for electric tram line rel¡¦
Wirye Line Urban Railway Construction (T/K) Basic ¡¦
Sejong-Anseong (Sections 1-3) Expressway Electrica¡¦
Feasibility study of modernization of vehicle main¡¦
Gangneung-Jejin Single-Line Railway Section 2 Cons¡¦
New Ansan Line (tentative name) Jangha Station Con¡¦
Bid design service for metropolitan area express r¡¦
Detailed design service for improvement of substat¡¦
Substation design service for 345kV applicant S/S ¡¦

[óÀ½] ¢¸  [1] 2 [3] [4] [5] [6] [7] [8] [9] [10]  ¢º [³¡]