Project Detail Design for Substructure work in Incheon New Port Container Terminal
Summary 0
Period 2009.01 ~ 2009.04
Test Item
Expenses 49,500,000¿ø
Ordering Korea Port Engineering Corporation
Basic and Detail Design for Electricity in Pyungta¡¦
Detail Design for Extra High Tension Line Replacem¡¦
Detail Design for Electricity and Communication Sy¡¦
Detail Design for Electrification of RTGC Power Sy¡¦
Detail Design for Electrical Facilities in Kwangya¡¦
T/K Design of Wungdong Area No.1 in Busan New Port¡¦
Detail Design for Electrical Facilities Repairemen¡¦
Detail Design for Substructure work in Incheon New¡¦
Detail Design for Relocation of 154kV Underground ¡¦
Basic Design for Underground Work of the Container¡¦
Feasibility Study for Electricity and Communicatio¡¦
Detail Design for Electrification in South Contain¡¦
Basic and Detail Design for Electrification in Nor¡¦
Basic and Detail Design for Electrification in Kwa¡¦
Detail Design for Electricity and Communication in¡¦
Detail Design for the Power Supply System at Busan¡¦
Design Service for Outdoor Power Supply System of ¡¦