Project Detailed design for Daejeon Railroad Vehicle Maintenance Group EMU-150 heavy maintenance facility improvement project - subway power facility design
Summary .
Period 2023-10-17 ~ 2024-04-22
Test Item
Expenses 143,000,000¿ø
Ordering DOHWA Engineering
Okjeong~Pocheon metropolitan railway system field ¡¦
Daegu Industrial Line Railway Construction Subway ¡¦
Janghang Line double-track railway new tramway con¡¦
Detailed design for Daejeon Railroad Vehicle Maint¡¦
Detailed design service for the tram line expansio¡¦
Basic and detailed design service for tramway betw¡¦
Basic and detailed design services for tramway for¡¦
Suseo-Gwangju double track railway section 2 const¡¦
Basic and detailed design service for subway power¡¦
Detailed design service for tramway improvement of¡¦
Detailed design service for tram track relocation ¡¦
Detailed design for Seoul Metropolitan Rapid Trans¡¦
Daejeon Railway Vehicle Maintenance Group EMU-150 ¡¦
Incheon New Port Phase 1-2 Construction Project Ma¡¦
Detailed design service for the improvement of pow¡¦
T/K detailed design service for construction work ¡¦
Basic and detailed design service for improvement ¡¦

[óÀ½] ¢¸  1 [2] [3] [4] [5] [6] [7] [8] [9] [10]  ¢º [³¡]