Project Design of the electric system for facilities for damage prevention of wonduk tunnel.
Summary .
Period 2015-03-03 ~ 2015-05-31
Test Item
Expenses 15,770,000¿ø
Ordering Korea expressway Corporation
Detailed design of Jinju~Gwangyang electrification¡¦
Detailed design of Electrical Equipment for Icheon¡¦
Detailed design for the double-track electrificati¡¦
Basic Design for Byeolnae Line (Amsa-Byeolnae) Dou¡¦
Detailed design for catenary and power supply syst¡¦
Basic and detailed design for catenary and power s¡¦
Basic and detailed design for catenary and power s¡¦
Design of the electric system for facilities for d¡¦
Detailed design for an apartment house of Busan-sc¡¦
Basic design of technical propositions of construc¡¦
Detailed design for a happiness apartment house in¡¦
Detailed design for an apartment house A-1BL in Go¡¦
Architectural design for construction work of heal¡¦
Detailed design for extension work of Hyupsung Uni¡¦
Detailed design for construction work of clean ene¡¦
Basic and detailed design for construction work fr¡¦
Basic and detailed design for catenary and power s¡¦

[óÀ½] ¢¸  [1] [2] [3] 4 [5] [6] [7] [8] [9] [10]  ¢º [³¡]