Company
CEO greeting
History
Organization
CI&Mascot
QMS
Registration&Prize
Map
Main Business
Design
Supervision
Construction
Diagnosis Service
R&D Service
Overseas Businesses
R&D Center
Purpose&Vision of Research
Technical Cooperation
Patent/utility model
Patent
Untility model
Customer Center
Gallery
Brochure
Q&A
Project
Design for the 154kV Substation in the Concentrated Load Area
Summary
CIS:170kV 20 cct, 25.8kV 92cct, MTR:154kV 45/60 MVA 8 Bank
Period
2005.10 ~ 2006.09
Test Item
Expenses
236,574,000¿ø
Ordering
Korea Electric Power Corporation
Detail Design for Hadong T/P S.W extension of 345k¡¦
Design for Replacement of 362kV GIS at SinNamwon S¡¦
Design for the 154kV Substation in the Concentrate¡¦
Design for Indoor Type 154kV GIS at Wangsipli S/S
Design Supervision for Installation Work of 154kv ¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for 22.9kV Incoming Spare Power
Detail Design for the Electric System at Celltrion¡¦
Detail Design for Automation of Busan Petroleum Re¡¦
Design for Control System of SinSuwon 345kV Power ¡¦
Design for 154kV Steel Tower Undergrounding Work a¡¦
Design for the Electric System at Incoming and Out¡¦
Design for Control System of 345kV S.W Extension a¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for Undergrounding Work of Interfering 154k¡¦
Design for the Cable Tunnel at University of Educa¡¦
Design for the Electric System from Ulsan to Pohan¡¦
[óÀ½]
¢¸
[1]
[2]
[3]
[4]
[5]
[6]
7
[8]
[9]
[10]
¢º
[³¡]