Project Detail Design for the Electric System at Celltrion Bio-Manufacturing Facility Project
Summary 0
Period 2003.03 ~ 2004.04
Test Item
Expenses 99,000,000¿ø
Ordering DAEWOO ENGINEERING & CONSTRUCTION
Detail Design for Hadong T/P S.W extension of 345k¡¦
Design for Replacement of 362kV GIS at SinNamwon S¡¦
Design for the 154kV Substation in the Concentrate¡¦
Design for Indoor Type 154kV GIS at Wangsipli S/S
Design Supervision for Installation Work of 154kv ¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for 22.9kV Incoming Spare Power
Detail Design for the Electric System at Celltrion¡¦
Detail Design for Automation of Busan Petroleum Re¡¦
Design for Control System of SinSuwon 345kV Power ¡¦
Design for 154kV Steel Tower Undergrounding Work a¡¦
Design for the Electric System at Incoming and Out¡¦
Design for Control System of 345kV S.W Extension a¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for Undergrounding Work of Interfering 154k¡¦
Design for the Cable Tunnel at University of Educa¡¦
Design for the Electric System from Ulsan to Pohan¡¦