Design for Relocation of 154kV Transmission Line at Hubis and SKC Suwon Factory
Summary
0
Period
2001.04 ~ 2001.05
Test Item
Expenses
45,080,000¿ø
Ordering
Korea National Housing Corporation
Detail Design for Hadong T/P S.W extension of 345k¡¦
Design for Replacement of 362kV GIS at SinNamwon S¡¦
Design for the 154kV Substation in the Concentrate¡¦
Design for Indoor Type 154kV GIS at Wangsipli S/S
Design Supervision for Installation Work of 154kv ¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for 22.9kV Incoming Spare Power
Detail Design for the Electric System at Celltrion¡¦
Detail Design for Automation of Busan Petroleum Re¡¦
Design for Control System of SinSuwon 345kV Power ¡¦
Design for 154kV Steel Tower Undergrounding Work a¡¦
Design for the Electric System at Incoming and Out¡¦
Design for Control System of 345kV S.W Extension a¡¦
Design for Relocation of 154kV Transmission Line a¡¦
Design for Undergrounding Work of Interfering 154k¡¦
Design for the Cable Tunnel at University of Educa¡¦
Design for the Electric System from Ulsan to Pohan¡¦