Project Design Improvement for Kwangyang Port 154kV Power Line, Phase 2, Stage No.1
Summary 0
Period 1999.12 ~ 2000.03
Test Item
Expenses 55,000,000¿ø
Ordering Korea Container Terminal Authority
Detail Design for Electrification of RTGC Power Sy¡¦
Detail Design for Electrical Facilities in Kwangya¡¦
T/K Design of Wungdong Area No.1 in Busan New Port¡¦
Detail Design for Electrical Facilities Repairemen¡¦
Detail Design for Substructure work in Incheon New¡¦
Detail Design for Relocation of 154kV Underground ¡¦
Basic Design for Underground Work of the Container¡¦
Feasibility Study for Electricity and Communicatio¡¦
Detail Design for Electrification in South Contain¡¦
Basic and Detail Design for Electrification in Nor¡¦
Basic and Detail Design for Electrification in Kwa¡¦
Detail Design for Electricity and Communication in¡¦
Detail Design for the Power Supply System at Busan¡¦
Design Service for Outdoor Power Supply System of ¡¦
Design Improvement for Kwangyang Port 154kV Power ¡¦
Basic and Detail Design for Kwangyang Container Te¡¦
Detail Design for Electric System of Sand Containe¡¦

[óÀ½] ¢¸  [1] [2] [3] 4 [5]  ¢º [³¡]