Project A study on measures to minimize lightning damage on catenary lines
Summary .
Period 2019.11 ~ 2021.12
Test Item
Expenses 555,000,000¿ø
Ordering Korea National Railway
3D-based catenary material management system model¡¦
Feasibility study of design and construction techn¡¦
A study on measures to minimize lightning damage o¡¦
Railway facility seismic standard strengthening an¡¦
Research on infrastructure improvement plan to imp¡¦
Stabilization analysis and study of electric railw¡¦
Investigation of the installation status of voltag¡¦
Investigation and analysis of urban railway design¡¦
Urban Railway Electric Power Field Survey Analysis¡¦
Automatic tension adjustment device test equipment¡¦

[óÀ½] ¢¸  1 [2] [3]  ¢º [³¡]