Project Railway facility seismic standard strengthening and institutional improvement research service
Summary .
Period 2018.07 ~ 2019.05
Test Item
Expenses 462,000,000¿ø
Ordering Korea Rail Network Authority
3D-based catenary material management system model¡¦
Feasibility study of design and construction techn¡¦
A study on measures to minimize lightning damage o¡¦
Railway facility seismic standard strengthening an¡¦
Research on infrastructure improvement plan to imp¡¦
Stabilization analysis and study of electric railw¡¦
Investigation of the installation status of voltag¡¦
Investigation and analysis of urban railway design¡¦
Urban Railway Electric Power Field Survey Analysis¡¦
Automatic tension adjustment device test equipment¡¦

[óÀ½] ¢¸  1 [2] [3]  ¢º [³¡]