Company
CEO greeting
History
Organization
CI&Mascot
QMS
Registration&Prize
Map
Main Business
Design
Supervision
Construction
Diagnosis Service
R&D Service
Overseas Businesses
R&D Center
Purpose&Vision of Research
Technical Cooperation
Patent/utility model
Patent
Untility model
Customer Center
Gallery
Brochure
Q&A
Project
Detail Design for Catenary and Power Supply System of the Double Track from Haman to Jinju on Kyungjeon Line, Private Infrastructure Investment Project
Summary
0
Period
2007.07 ~ 2008.02
Test Item
Expenses
848,100,000¿ø
Ordering
Hyundai Engineering & Construction
Detail Design for the Power Supply System from Jin¡¦
Basic and Detail Design for Transmission Line and ¡¦
Feasibility Study and Basic Plan for Dongducheon Y¡¦
Detail Design for Catenary System from Iksan to Kw¡¦
Basic Design for Electrification of the Double Tra¡¦
Detail Design for the Traction Power Supply System¡¦
Detail Design for Electrification of Honam High Sp¡¦
Detail Design for Electrification of Double Track ¡¦
Redesign for Electrification on Kyungchun Line, Se¡¦
Basic Design for the Power Supply System from Poha¡¦
Detail Design for Relocation of Interfere ring Cat¡¦
Basic Design for the Electrification of Honam High¡¦
Basic Design for Electrification of the Double Tr¡¦
Detail Design for Relocation of Interfering Transm¡¦
Detail Design for Electrification of Busan Rolloin¡¦
Detail Design for Catenary and Power Supply System¡¦
Detail Design for Relocation of Interfering Catena¡¦
[óÀ½]
¢¸
[1]
[2]
[3]
4
[5]
[6]
[7]
[8]
[9]
¢º
[³¡]