Project Basic Design for Traction Power Supply System of Double Track from Bujeon to Masan
Summary 0
Period 2006.11 ~ 2007.12
Test Item
Expenses 79,119,950¿ø
Ordering Korea Rail Network Authority
Basic Design for Traction Power Supply System of D¡¦
Design for Supplementation of the Catenary System ¡¦
Detail Design for Traction Power Supply System fro¡¦
Basic Design for Electrification from Samyangjin t¡¦
Detail Design for Relocation of Interfering Catena¡¦
Detail Design for Relocation of Power Distribution¡¦
Detail Design for Relocation of 22.9kV Power Incom¡¦
Detail Design for Electrification of Double Track ¡¦
Detail Design for Supplimentation Work at 24 place¡¦
Detail Design for the Lighting Facilities of the T¡¦
Detail Design for Substation by New Transmission L¡¦
Detail Design for Catenary System Improvement at K¡¦
Detail Design for Lighting Tower Improvement at Yo¡¦
Basic Design for the Power Supply System from Jinj¡¦
Detail Design for Power Supply System Improvement ¡¦
Detail Design for the Lighting System Improvement ¡¦
Detail Design Supervision for Yongin Light Rail Tr¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] 5 [6] [7] [8] [9]  ¢º [³¡]