Project Basic and Detail Design for Catenary and Power Supply System from Haman to Jinju on Kyungjeon Line, Phase No.1
Summary 0
Period 2002.12 ~ 2005.12
Test Item
Expenses 800,000,000¿ø
Ordering KORAIL
Detail Design for Power Supply System from Jungok ¡¦
Feasibility Study and Basic Plan for the Double Tr¡¦
Detail Design for the Roadbed of the Double Track ¡¦
Detail Design for Reinforcement on Chunyang Transm¡¦
Detail Design for Traction Power Supply System Imp¡¦
Basic and Detail Design for Catenary and Power Sup¡¦
Detail Design for the Catenary System from Singi t¡¦
Detail Design for Relocation of Interfering Power ¡¦
Redesign and CAD work for Data Modification of Pow¡¦
Detail Design for Neutral Section Equipments Impro¡¦
Detail Design for Catenary System Improvement from¡¦
Study for Inspection Cycle Adjustment of Catenary ¡¦
Detail Design Supervision for Catenary and Power S¡¦
Detail Design Supervision Catenary and Power Suppl¡¦
Detail Design for the Catenary System from Songjun¡¦
Detail Design for the Catenary System Improvement ¡¦
Detail Design for Catenary System Restoration as e¡¦

[óÀ½] ¢¸  [1] [2] [3] [4] [5] [6] 7 [8] [9]  ¢º [³¡]