Project Basic design for power supply facilities in the electrification of railroad, on double track, Seohae line
Summary Overhead contact line, Power supply facilities: 72.649km
Period 2012-07-13 ~ 2012-10-30
Test Item
Expenses 841,709,000¿ø
Ordering Korea Railway Network Authority
Detailed design of Jinju~Gwangyang Electric Transm¡¦
Detailed design of Jinju~Gwangyang electrification¡¦
Detailed design of Electrical Equipment for Icheon¡¦
Detailed design for the double-track electrificati¡¦
Detailed design for catenary and power supply syst¡¦
Basic and detailed design for catenary and power s¡¦
Basic and detailed design for catenary and power s¡¦
Basic and detailed design for Railroad Constructio¡¦
Detailed design for transmission line and traction¡¦
Detailed design for electromotive facilities impro¡¦
Detailed design for the electrification on double ¡¦
Basic design for power supply facilities in the el¡¦
Detailed design of 154kV Transmission Line and Tra¡¦
Detailed design of Head-spen Line Improvement from¡¦
Detailed design for Relocation of interfering Cate¡¦
Basic design of Catenary system for 400km/h speed
Detail Design for Relocation of Interfering Catena¡¦