Project Feasibility study for the 2nd phase of the Bandung-Cirbon high-speed rail project (electric power, tram line)
Summary .
Period 2015-09-01 ~ ÁØ°øÀϱîÁö
Test Item
Expenses 33,000,000¿ø
Ordering Pyunghwa Engineering
Poland High-Speed Rail PR-7 Basic Design-Electric
Pre-Feasibility Study for the New SGR Project of t¡¦
Myanmar Mandalay to Myithyina Railway Rehabilitati¡¦
Vietnam Ho Chi Minh Metro section 5-2 Pre-F/S (pre¡¦
Turkey Halkali-Gebze High-Speed Rail Project Feasi¡¦
Preliminary feasibility study service for Mongolia¡¦
Indonesia Jakarta - Surabaya Preliminary feasibili¡¦
Detailed Design for Nepal High-Speed Railway Inaru¡¦
Electrical sector among FS design services for IRA¡¦
Feasibility study for the 2nd phase of the Bandung¡¦

[óÀ½] ¢¸  1 [2]  ¢º [³¡]