Project Feasibility study of design and construction technique development for extension of maximum current length of catenary
Summary .
Period 2022-02-16 ~ 2022-08-15
Test Item
Expenses 91,000,000¿ø
Ordering Korea National Railway
3D-based catenary material management system model¡¦
Feasibility study of design and construction techn¡¦
A study on measures to minimize lightning damage o¡¦
Railway facility seismic standard strengthening an¡¦
Research on infrastructure improvement plan to imp¡¦
Stabilization analysis and study of electric railw¡¦
Investigation of the installation status of voltag¡¦
Investigation and analysis of urban railway design¡¦
Urban Railway Electric Power Field Survey Analysis¡¦
Automatic tension adjustment device test equipment¡¦
Research on Infrastructure improvement for the adv¡¦
Research and analysis for stabilization of the Fee¡¦
Research on actual design utilization of the autom¡¦
Research on the development of economical sized 15¡¦
Analysis of electric power characteristics of magn¡¦
Research on the standard and the guideline for Ele¡¦
Research on the protection of high-speed railway s¡¦

[óÀ½] ¢¸  1 [2]  ¢º [³¡]