Project Indonesia Jakarta - Surabaya Preliminary feasibility study service for speed improvement of the existing line (electric power, tram line field)
Summary .
Period 2017-09-25 ~ 2017-12-14
Test Item
Expenses 20,808,000¿ø
Ordering Korea National Railway
Poland High-Speed Rail PR-7 Basic Design-Electric
Pre-Feasibility Study for the New SGR Project of t¡¦
Myanmar Mandalay to Myithyina Railway Rehabilitati¡¦
Vietnam Ho Chi Minh Metro section 5-2 Pre-F/S (pre¡¦
Turkey Halkali-Gebze High-Speed Rail Project Feasi¡¦
Preliminary feasibility study service for Mongolia¡¦
Indonesia Jakarta - Surabaya Preliminary feasibili¡¦
Detailed Design for Nepal High-Speed Railway Inaru¡¦
Electrical sector among FS design services for IRA¡¦
Feasibility study for the 2nd phase of the Bandung¡¦
India¡¯s Delhi-Mumbai existing line improvement pr¡¦
Malaysia-Singapore high-speed rail feasibility stu¡¦
Detailed investigation and design service for the ¡¦
Algerian Subway Line 1 Extension Line (Section 1) ¡¦
Mongolia Tavan Tolgoi Industrial Railway
Brazil High Speed Railway Project from Rio de Jane¡¦
New Railway Construction and Existing Railroad Reh¡¦

[óÀ½] ¢¸  1 [2]  ¢º [³¡]