Project Electric construction replacement of railway construction between Wonju and Gangneung, Section 9
Summary .
Period 2014-08-14 ~ 2015-08-31
Test Item
Expenses 26,829,000,000¿ø
Ordering Korea Railway Network Authority
23-046-2 00 unit training ground electrical work
22-Army-00 unit electrical work (1541)
Gangnam Walk Bridge Center installation work (elec¡¦
22-075-1 Electrical work for 3 places including Un¡¦
Electric power trunk replacement work for Sanggye ¡¦
Dodam-Yeongcheon Double Track Railway Ongcheon Sig¡¦
Reinforcement of iron pole beam improvement work f¡¦
Electrification of Gyeongui Line Munsan-Imjingang ¡¦
Bundang Line Bundang Vehicle Depot and 1 other pla¡¦
Replace construction of messenger wire fittings be¡¦
Electric construction replacement of railway const¡¦
Rapid restoration work for flood damage places bet¡¦
Electric Construction to improve the air condition¡¦
Electric System improvement for auxiliary faciliti¡¦
Installation for the night lighting of Nabu Circli¡¦
Electric Construction to improve the audiovisual r¡¦
Electric Construction to improve the washroom at D¡¦