Project Design Improvement for Kwangyang Port 154kV Power Line, Phase 2, Stage No.1
Summary 0
Period 1999.12 ~ 2000.03
Test Item
Expenses 55,000,000¿ø
Ordering Korea Container Terminal Authority
Design Improvement for Kwangyang Port 154kV Power ¡¦
Basic and Detail Design for Kwangyang Container Te¡¦
Detail Design for Electric System of Sand Containe¡¦
Basic and Detail Design for Steel Lighting Tower i¡¦
Design for Electrification in Gunjang Port
Basic and Detail Design for 154kV Incoming Power L¡¦
Detail Design for Power Supply System in Busan Sin¡¦
Basic and Detail Design for 154kV Incoming Power L¡¦
Detail Design for Substation Equipment Replacement¡¦
Countermeasure Study for Traffic Improvement of No¡¦
Design for Rectifier Replacement of Dusil Substati¡¦
Basic and Detail Design for Rolling Stock Operatio¡¦
Basic Design Supplementation and Service for Biddi¡¦
"Design for Bidding Document of Rolling Stock Oper¡¦
Detail Design for the Catenary System on Daegu Sub¡¦
Basic and Detail Design for Model Line of Urban Ma¡¦
Detail Design for Supplimentation Work for Electri¡¦

[óÀ½] ¢¸  11 [12] [13] [14] [15] [16] [17] [18]  ¢º [³¡]