Project Design Improvement for Kwangyang Port 154kV Power Line, Phase 2, Stage No.1
Summary 0
Period 1999.12 ~ 2000.03
Test Item
Expenses 55,000,000원
Ordering Korea Container Terminal Authority
Design Improvement for Kwangyang Port 154kV Power …
Basic and Detail Design for Kwangyang Container Te…
Detail Design for Electric System of Sand Containe…
Basic and Detail Design for Steel Lighting Tower i…
Design for Electrification in Gunjang Port
Basic and Detail Design for 154kV Incoming Power L…
Detail Design for Power Supply System in Busan Sin…
Basic and Detail Design for 154kV Incoming Power L…
Detail Design for Substation Equipment Replacement…
Countermeasure Study for Traffic Improvement of No…
Design for Rectifier Replacement of Dusil Substati…
Basic and Detail Design for Rolling Stock Operatio…
Basic Design Supplementation and Service for Biddi…
"Design for Bidding Document of Rolling Stock Oper…
Detail Design for the Catenary System on Daegu Sub…
Basic and Detail Design for Model Line of Urban Ma…
Detail Design for Supplimentation Work for Electri…

[처음] ◀  11 [12] [13] [14] [15] [16] [17] [18]  ▶ [끝]