Project Detail Design for Traction Power Supply System and SCADA on Seoul Subway Line No. 9
Summary 0
Period 2005.02 ~ 2006.09
Test Item
Expenses 368,226,100¿ø
Ordering POSCO ICT
"Design for Bidding Document of Rolling Stock Oper¡¦
Detail Design for the Catenary System on Daegu Sub¡¦
Basic and Detail Design for Model Line of Urban Ma¡¦
Detail Design for Supplimentation Work for Electri¡¦
Detail Design for the Electrical System on Extende¡¦
Detail Design for Mobile Public Convenient Facilit¡¦
Detail Design for the Electrification on Kyungsan ¡¦
Detail Design for Rectifier Replacement of Busan S¡¦
Safety Diagnosis for Undergrounded 154kV Electrica¡¦
Detail Design for the Passenger Station of Seoul M¡¦
Detail Design for Stray Current Area on Seoul Metr¡¦
Detail Design for Traction Power Supply System and¡¦
Countermeasure Study for Decrepited Rectifier of t¡¦
Detail Design for T/K base Project of Busan Subway¡¦
Detail Design for Replacement of Decrepited Substa¡¦
Basic and Detail Design for Public Convenient Faci¡¦
Detail Design for Filter System at the Substation ¡¦

[óÀ½] ¢¸  [1] 2 [3]  ¢º [³¡]