Project Detail Design for the Public Convenient Facilities of Seoul Metropolitan Subway Line No.4-8
Summary 0
Period 1999.07 ~ 2000.05
Test Item
Expenses 6,853,000¿ø
Ordering Seoul Metropolitan Rapid Transit Corporation
Basic and Detail Design for Public Convenient Faci¡¦
Precise Technical Diagnosis for the Power Supply S¡¦
Detail Design for Power Supply System Replacement ¡¦
Technical Review for Power Supply System of Yangsa¡¦
Detail Design for the Catenary System and the Gene¡¦
Detail Design for the Public Convenient Facilities¡¦
Analysis for Power Supply System of Seoul Metropol¡¦
Basic Design for Transmission Line and Traction Po¡¦
Basic Design for Electrification from Minam to Ban¡¦
Basic Design for Electrification from Daeju to Suy¡¦
Basic Design for Electrification on Daegu Subway, ¡¦
Basic Design for Electrification on Daegu Subway, ¡¦
Basic Design for Electrification on Gwangju Metrop¡¦
Design for T/K base Proposal of Busan Subway Line ¡¦
Design for T/K base Proposal of Busan Subway Line ¡¦

[óÀ½] ¢¸  [1] [2] 3  ¢º [³¡]