Company
CEO greeting
History
Organization
CI&Mascot
QMS
Registration&Prize
Map
Main Business
Design
Supervision
Construction
Diagnosis Service
R&D Service
Overseas Businesses
R&D Center
Purpose&Vision of Research
Technical Cooperation
Patent/utility model
Patent
Untility model
Customer Center
Gallery
Brochure
Q&A
Project
3D-based catenary material management system modeling technology development research service
Summary
.
Period
2022.10.28 ~ 2024.06.30
Test Item
Expenses
516,200,000¿ø
Ordering
Korea National Railway
Survey of the electric power system technology for¡¦
Study on the harmonic wave reduction system for Gu¡¦
Ground connection design and simulation for electr¡¦
Improvement of Ground protection system on subway ¡¦
Development of potimization and diagnostic techniq¡¦
Research on higher harmonic wave analysis and impr¡¦
Safety control countermeasure for street furniture¡¦
Research on check-up frequency adjustment for elec¡¦
Research on the facility standard for railway powe¡¦
[óÀ½]
¢¸
[1]
2
¢º
[³¡]