Project Feasibility Study and Basic Plan for Dongducheon Yeoncheon Double Track
Summary 0
Period 2010.03 ~ 2011.01
Test Item
Expenses 11,396,000¿ø
Ordering Dong Myeong Engineering Consultants
Detail Design for the Catenary System and the Gene¡¦
Detail Design for the Public Convenient Facilities¡¦
Analysis for Power Supply System of Seoul Metropol¡¦
Basic Design for Transmission Line and Traction Po¡¦
Basic Design for Electrification from Minam to Ban¡¦
Basic Design for Electrification from Daeju to Suy¡¦
Basic Design for Electrification on Daegu Subway, ¡¦
Basic Design for Electrification on Daegu Subway, ¡¦
Basic Design for Electrification on Gwangju Metrop¡¦
Design for T/K base Proposal of Busan Subway Line ¡¦
Design for T/K base Proposal of Busan Subway Line ¡¦
Detail Design for Relocation of Interfering Catena¡¦
Detail Design for the Power Supply System from Jin¡¦
Basic and Detail Design for Transmission Line and ¡¦
Feasibility Study and Basic Plan for Dongducheon Y¡¦
Detail Design for Catenary System from Iksan to Kw¡¦
Basic Design for Electrification of the Double Tra¡¦

[óÀ½] ¢¸  [11] [12] 13 [14] [15] [16] [17] [18]  ¢º [³¡]