Detail Design for the Power Supply System on Jeonla Line, Stage No.1 and Stage No.2
Summary
0
Period
1997.04 ~ 1998.11
Test Item
Expenses
94,230,000¿ø
Ordering
KORAIL
Detail Design for Electrification from Backyangli ¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary System Improvement from¡¦
Detail Design for Bidding Documents of the Double ¡¦
Detail Design for Relocation of the Power Supply S¡¦
Standardization and CAD Work for the Catenary Syst¡¦
Detail Design for Electrification of the Double Tr¡¦
Detail Design for Catenary and Power Supply System¡¦
Design for Turn Key Base Proposal of Seoul Rolling¡¦
Detail Design for High Voltage Distribution Line I¡¦
Detail Design for the Power Supply System on Jeonl¡¦
Detail Design for Relocation of the Catenary Syste¡¦
Service for Electricity Business Plan on Hanam Lig¡¦
Detail Design for Auxiliary Power Line Installatio¡¦
Detail Design for Catenary System Improvement on J¡¦
Detail Design for the Catenary System at Buchun Pr¡¦