Company
CEO greeting
History
Organization
CI&Mascot
QMS
Registration&Prize
Map
Main Business
Design
Supervision
Construction
Diagnosis Service
R&D Service
Overseas Businesses
R&D Center
Purpose&Vision of Research
Technical Cooperation
Patent/utility model
Patent
Untility model
Customer Center
Gallery
Brochure
Q&A
Project
Basic Design for Electrification of the Double Track from Sosa to Wonsi, Private Infrastructure Investment Project
Summary
0
Period
2008.03 ~ 2008.12
Test Item
Expenses
792,000,000¿ø
Ordering
Korea Rail Network Authority
Detail Design for the Traction Power Supply System¡¦
Detail Design for Electrification of Honam High Sp¡¦
Detail Design for Electrification of Double Track ¡¦
Redesign for Electrification on Kyungchun Line, Se¡¦
Basic Design for the Power Supply System from Poha¡¦
Detail Design for Relocation of Interfere ring Cat¡¦
Basic Design for the Electrification of Honam High¡¦
Basic Design for Electrification of the Double Tr¡¦
Detail Design for Relocation of Interfering Transm¡¦
Detail Design for Electrification of Busan Rolloin¡¦
Detail Design for Catenary and Power Supply System¡¦
Detail Design for Relocation of Interfering Catena¡¦
Basic Design for Traction Power Supply System of D¡¦
Design for Supplementation of the Catenary System ¡¦
Detail Design for Traction Power Supply System fro¡¦
Basic Design for Electrification from Samyangjin t¡¦
Detail Design for Relocation of Interfering Catena¡¦
[óÀ½]
¢¸
[11]
[12]
[13]
14
[15]
[16]
[17]
[18]
¢º
[³¡]