Project Design for Supplementation of the Catenary System at Goyang Rolling Stock Depot, Phase No.2
Summary 0
Period 2006.02 ~ 2006.02
Test Item
Expenses 6,856,300¿ø
Ordering KORAIL
Detail Design for the Traction Power Supply System¡¦
Detail Design for Electrification of Honam High Sp¡¦
Detail Design for Electrification of Double Track ¡¦
Redesign for Electrification on Kyungchun Line, Se¡¦
Basic Design for the Power Supply System from Poha¡¦
Detail Design for Relocation of Interfere ring Cat¡¦
Basic Design for the Electrification of Honam High¡¦
Basic Design for Electrification of the Double Tr¡¦
Detail Design for Relocation of Interfering Transm¡¦
Detail Design for Electrification of Busan Rolloin¡¦
Detail Design for Catenary and Power Supply System¡¦
Detail Design for Relocation of Interfering Catena¡¦
Basic Design for Traction Power Supply System of D¡¦
Design for Supplementation of the Catenary System ¡¦
Detail Design for Traction Power Supply System fro¡¦
Basic Design for Electrification from Samyangjin t¡¦
Detail Design for Relocation of Interfering Catena¡¦

[óÀ½] ¢¸  [11] [12] [13] 14 [15] [16] [17] [18]  ¢º [³¡]