Project Detail Design for the Power Supply System at Goyang High Speed Railway Rolling Stock Depot
Summary 0
Period 2004.10 ~ 2004.11
Test Item
Expenses 18,400,000¿ø
Ordering KORAIL
Detail Design for Relocation of Power Distribution¡¦
Detail Design for Relocation of 22.9kV Power Incom¡¦
Detail Design for Electrification of Double Track ¡¦
Detail Design for Supplimentation Work at 24 place¡¦
Detail Design for the Lighting Facilities of the T¡¦
Detail Design for Substation by New Transmission L¡¦
Detail Design for Catenary System Improvement at K¡¦
Detail Design for Lighting Tower Improvement at Yo¡¦
Basic Design for the Power Supply System from Jinj¡¦
Detail Design for Power Supply System Improvement ¡¦
Detail Design for the Lighting System Improvement ¡¦
Detail Design Supervision for Yongin Light Rail Tr¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for the Catenary and Power Supply Sy¡¦
Detail Design for the Power Supply System at Goyan¡¦
Detail Design Supervision for the Catenary and the¡¦

[óÀ½] ¢¸  [11] [12] [13] [14] 15 [16] [17] [18]  ¢º [³¡]