Project Detail Design for the Catenary System from Juklyung to Youngjoo on Joongang Line
Summary 0
Period 2005.04 ~ 2005.05
Test Item
Expenses 11,950,000¿ø
Ordering KORAIL
Detail Design Supervision for the Catenary System ¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for New Installation of Chungyang Sp¡¦
Detail Design for the Flame Resistance Work at 3 p¡¦
Detail Design for Catenary System Improvement at 2¡¦
Detail Design for the Electrical Remote Control Fa¡¦
Detail Design for the Equipotential Ground Facilit¡¦
Detail Design for the Catenary System from Juklyun¡¦
Detail Design for the Catenary System from Daegu t¡¦
Detail Design for the Traction Power Supply System¡¦
Detail Design for Power Supply System Replacement ¡¦
Detail Design for Power Supply System from Jungok ¡¦
Feasibility Study and Basic Plan for the Double Tr¡¦
Detail Design for the Roadbed of the Double Track ¡¦
Detail Design for Reinforcement on Chunyang Transm¡¦
Detail Design for Traction Power Supply System Imp¡¦