Project Detail Design for the Catenary System from Daegu to Busan on Gyeongbu High Speed Railway, Phase No.2
Summary 0
Period 2004.08 ~ 2008.12
Test Item
Expenses 673,431,078¿ø
Ordering Korea Rail Network Authority
Detail Design Supervision for the Catenary System ¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for Traction Power Supply System Imp¡¦
Detail Design for New Installation of Chungyang Sp¡¦
Detail Design for the Flame Resistance Work at 3 p¡¦
Detail Design for Catenary System Improvement at 2¡¦
Detail Design for the Electrical Remote Control Fa¡¦
Detail Design for the Equipotential Ground Facilit¡¦
Detail Design for the Catenary System from Juklyun¡¦
Detail Design for the Catenary System from Daegu t¡¦
Detail Design for the Traction Power Supply System¡¦
Detail Design for Power Supply System Replacement ¡¦
Detail Design for Power Supply System from Jungok ¡¦
Feasibility Study and Basic Plan for the Double Tr¡¦
Detail Design for the Roadbed of the Double Track ¡¦
Detail Design for Reinforcement on Chunyang Transm¡¦
Detail Design for Traction Power Supply System Imp¡¦