Project Detail Design Supervision Catenary and Power Supply System from Donghae to Kangryung on Youngdong Line
Summary 0
Period 2001.07 ~ 2001.12
Test Item
Expenses 110,127,000¿ø
Ordering KORAIL
Basic and Detail Design for Catenary and Power Sup¡¦
Detail Design for the Catenary System from Singi t¡¦
Detail Design for Relocation of Interfering Power ¡¦
Redesign and CAD work for Data Modification of Pow¡¦
Detail Design for Neutral Section Equipments Impro¡¦
Detail Design for Catenary System Improvement from¡¦
Study for Inspection Cycle Adjustment of Catenary ¡¦
Detail Design Supervision for Catenary and Power S¡¦
Detail Design Supervision Catenary and Power Suppl¡¦
Detail Design for the Catenary System from Songjun¡¦
Detail Design for the Catenary System Improvement ¡¦
Detail Design for Catenary System Restoration as e¡¦
Detail Design for the Electrifical Facilities from¡¦
Detail Design for the Catenary System of the Rolli¡¦
Detail Design for the Power Supply System at 3 pla¡¦
Service for Standard Method of Actual Cost Calcula¡¦
Basic Design for Electrification of the Rolling St¡¦