Project Basic and Detail Design for Public Convenient Facilities on Seoul Metropolitan Subway Line
Summary 0
Period 2001.03 ~ 2004.02
Test Item
Expenses 252,773,400¿ø
Ordering Seoul Metropolitan Government Office of Subway Construction
Detail Design for the Electrical System on Extende¡¦
Detail Design for Mobile Public Convenient Facilit¡¦
Detail Design for the Electrification on Kyungsan ¡¦
Detail Design for Rectifier Replacement of Busan S¡¦
Safety Diagnosis for Undergrounded 154kV Electrica¡¦
Detail Design for the Passenger Station of Seoul M¡¦
Detail Design for Stray Current Area on Seoul Metr¡¦
Detail Design for Traction Power Supply System and¡¦
Countermeasure Study for Decrepited Rectifier of t¡¦
Detail Design for T/K base Project of Busan Subway¡¦
Detail Design for Replacement of Decrepited Substa¡¦
Basic and Detail Design for Public Convenient Faci¡¦
Detail Design for Filter System at the Substation ¡¦
Basic and Detail Design for Public Convenient Faci¡¦
Precise Technical Diagnosis for the Power Supply S¡¦
Detail Design for Power Supply System Replacement ¡¦
Technical Review for Power Supply System of Yangsa¡¦

[óÀ½] ¢¸  [11] 12 [13] [14] [15] [16] [17] [18]  ¢º [³¡]